The kanban board is going up!

One of the things that we came to a decision about during our retrospective after sprint zero is that we’re happier with a highly visible workload management tool. During our between sprint planning, we’ve elected to adopt some of the kanban practices that I picked up during my time at Microsoft.

Having physical cards to move across the board helps to maintain the momentum cycle and makes it very easy to visually keep score. Both of which are very important, as we’ve come to accept that we’re in a marathon, not a sprint. No pun intended.

In the spirit of “pix or it didn’t happen”, I’ll be posting occasional pix of the board as soon as we have it hung, striped and loaded with work.